A1 — Custom decks

Composite, PVC, cedar — and the hardwoods most builders won’t touch.

A deck should be drawn for the house it joins and detailed for nine wet months a year. That’s the job, and the materials list shouldn’t stop where the easy installs end.

Photo TBD · hardwood deck elevation, older Portland home (§9.1-1)
ipe 1×6 · hidden fasteners flashed ledger — never lagged to siding
CCB #138911 Licensed, bonded & insured 70+ projects since 2020 Portland & the east side 5-yr written workmanship warranty
A1.1 — materials

The four materials, honestly

Every material here has a real trade-off. Naming it is how you end up with the right deck instead of the one that was easiest to sell.

Composite — TimberTech & Deckorators

The sane default: fifteen-plus years of low effort, no splinters, no spring sanding ritual. Two honest caveats — dark boards get hot barefoot in August sun, and because composite is what everyone builds, it does the least to set your house apart. We install it constantly and happily; we’ll also tell you when your house deserves the next shelf up.

Best for: low-maintenance briefs, rentals, shade-to-part-sun exposures.

Sits at the lower half of the $85–$100/sq ft range.

PVC — TimberTech (Azek) & Wolf

The performance pick for the Northwest: it doesn’t absorb water, which is most of what kills decks here, and it’s the coolest-running and lightest of the synthetics. The trades: it costs hardwood money without being wood, and up close its grain is very good rather than actual. Where a deck lives in shade, moss, and nine wet months, it’s frequently the right answer anyway.

Best for: full shade, moss-prone lots, second-story decks over living space.

Upper half of the range.

Cedar

The hometown board — it smells right, works right, and suits an older Portland house like nothing synthetic can. It also asks the most of you: a wash and re-oil every year or two, or it goes gray and soft. Budget the maintenance honestly or choose something else — a neglected cedar deck is the saddest thing we replace.

Best for: older houses, ground-level platforms, owners who like the ritual.

Bottom of the range — the maintenance is where the cost lives.

Hardwood — ipe, cumaru, tigerwood, mahogany

Ipe is the last deck you’ll build: harder than nails will tolerate — every hole gets pre-drilled — dense enough to shrug off decades of Portland weather, and better looking every year if you oil it (or left to silver on purpose). It costs the most, and installing it is slow, skilled work, which is why most builders won’t quote it.

Best for: the top of the market, houses with real architectural character.

Top of the range and past it. No manufacturer warranty exists — ours covers it.

A1.2 — build-up

The parts you’ll never see are the parts that matter

Scroll: the deck comes apart layer by layer. Decks don’t fail at the boards — they fail at the ledger, the flashing, and the footings.

  1. Decking gapped for drainage, hidden clips, no face screws
  2. Ledger & flashing bolted to framing, flashed and counter-flashed
  3. Joists & blocking sized and spaced for the span, not the minimum
  4. Beam & 6×6 posts through-bolted connections
  5. Footings engineered, poured below frost depth
A1.3 — site conditions

Your lot is the interesting part

In the city

Elevation changes, narrow side yards, protected trees, and ledgers that meet 1910s framing. Portland BDS permits — including knowing when a low platform deck doesn’t need one — historic and conservation district review, and material logistics for backyards with no access. This is most of what we do.

East of 205

Sloped and walk-out lots, engineered footings, attachment to modern construction — and the HOA. We produce the architectural committee package and pull the Clackamas County permit as part of the job.

A1.4 — budget

What a deck like this costs

Most of our custom decks land between $25,000 and $60,000 — the range runs $85–$100 per square foot installed, depending on material, elevation, access, and structure.

A ground-level 280 sq ft composite deck sits near the bottom of that range; an elevated ipe deck with custom rail sits past the top of it. If your budget is under $15,000, we’re likely not the right fit — and we’d rather you know that now than after a Saturday consultation.

The number that actually matters is the one for your site and your material — that’s what the design consultation produces, in writing.

In writing: 5-year structural workmanship warranty on every deck — and on hardwood, where no manufacturer warranty exists, ours is the warranty.

Read it →
Next step

Start with a drawing.

The design consultation is 60–90 minutes at your home: measurements, material samples in hand, and straight answers on feasibility, permits, and budget. It is not a hard sell — it’s the first working session of your project.